Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3958.65
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 12, 2008     Elevator mounting - (2.0 hours)       Category: Controls
I began mounting the elevators today. First, I installed the remaining two elevator pushrods through the aft fuselage. Attaching the small (forward) one to the bellcrank requires a lot of ingenuity and squirming around in tight quarters, but I got it done without drawing any blood, or cussing too much.
I noted that one of the pushrods makes contact with the bottom of one of the bulkhead holes, so I'll have to enlarge the hole slightly (see photo #3 below).

Next, I bolted the elevators to the horizontal stabilizers and clamped them in the neutral position. I centered the sticks in the vertical position, and noted the position of the aft end of the large elevator pushrod against the elevator horns. It looks like things will work out very well here. I'll need to do some trimming of the sides of the aft fuselage deck so the horns clear.

I also took some initial measurements of the elevator up/down travel. Right now, with no adjustments, I get 20 degrees up and 25 degrees down.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.